Saturday, December 16, 2006
This past week all of the drywall was installed and the litter strewn floors were cleaned. No more peeking through the wall studs :) Both garage doors were also installed. Dh's "barn"(garage) is nearly complete! Next week work begins on the outside with the installation of our siding; ceiling insullation is to be "blown" in the attic; carpet and other flooring materials are to be measured; rock for the hearth ordered; tile for the masterbath shower and kitchen backsplash ordered; drywall to be taped ... bullnose corners installed ... and skip troweling the texture on the wall and ceiling surface; and the interior doors and hardware need to be ordered. It will be a busy week to say the least.
Photos (top to bottom) Bonus room (guest/office) above garage; storage area (with tub) in basement; sunny day; basement family room showing fireplace; Ann's bedroom bay window with newly installed cedar shingles.
0 comments:
Post a Comment